Description: Maranoa Logo Process

Late Items

BUSINESS PAPER

 

General Meeting

 

Wednesday 14 December 2011

 

Roma Administration Centre

 

NOTICE OF MEETING

 

Date: 12 December 2011

 

 

Mayor:                                                    Councillor R S Loughnan

 

Deputy Mayor:                                        Councillor T G Hartley

Councillors:                                             Councillor J P Bartels

                                                              Councillor J L Chambers

                                                              Councillor R J Denton

                                                              Councillor W M Newman

                                                              Councillor M L Price

                                                              Councillor W S Wason

                                                              Councillor J S Watson

 

Chief Executive Officer:                            Mr Paul Bawden

 

Senior Management:                                Mr Tony Klein (Director Community Services)

                                                              Mr Matthew McGoldrick (Director Corporate Services)

                                                              Mr Stephen Mow (Acting Director Operations)

                                                              Mr Rob Hayward (Director Planning & Environment)

 

Officers:                                                  Ms Jane Frith (Corporate Communications Officer)

 

Please find attached agenda for the General Meeting to be held at the Roma Administration Centre on December 14, 2011 at 9.00AM.

Paul Bawden

Chief Executive Officer

 

 


Maranoa Regional Council

    

General Meeting -  14 December 2011

TABLE OF CONTENTS

Item       Subject

No

  

15          Late Items

15.2      Maranoa Regional Placemaking Concept Plans

Prepared by:      Noela Ward, Manager Community Development

Attachment :       Placemaking Concept Plans - Surat

15.3      Naming of Unnamed Roads - ULDA

Prepared by:      Jodie Young, Administration Officer

Attachment :       Cover letter and Map of Roads to be named

15.3      Outback, Gulf & Western Downs Tourism Opportunity Plan

Prepared by:      Edward Sims, Manager Organisational Performance

Attachment :       Outback Gulf and  Western Downs Tourism Opportunity Plan Draft for consultation

15.4      Revocation of Trusteeship of the Recreation Reserve and Reserve for Local Government purposes - McDowall St, accross from the Hospital

Prepared by:      Matthew McGoldrick, Director of Corporate Services

15.5      Tender for the Management of the Mitchell Spa and Tender for the Recontruction of the Mitchell Spa or Construction of a New Spa

Prepared by:      Matthew McGoldrick, Director of Corporate Services

Attachment :       Mitchell Pool & Spa Management Agreement Alan Male and Associates  

 

 


Maranoa Regional Council

    

General Meeting -  14 December 2011

Officer Report

Meeting: General  14 December 2011

Date: 11 November 2011

Item Number: 15.2

File Number: D11/33191

 

Subject Heading:                     Maranoa Regional Placemaking Concept Plans

Classification:                                  Open Access  

Name of Applicant:                        

Location:                                           Maranoa Region

Author & Officer’s Title:                 Noela Ward, Manager Community Development

 

 

Executive Summary:  

The development of community master plans for all townships within the Maranoa is identified in the Maranoa Community Plan 2020 as a short term action to be undertaken by Council.  Place Design Group was engaged by Council to develop placemaking concept plans for towns within the Maranoa Region.  An extensive program of community engagement and validation was undertaken with the assistance of Council’s Community Development Department.  The project elements of research, engagement, and concept design and validation has been completed by the consultant and the Maranoa Placemaking Strategy is presented to Council for endorsement.

 

 

Officer’s Recommendations: 

1.    Council endorse the –

Maranoa Placemaking Strategy Amby October 2011;

Maranoa Placemaking Strategy Injune October 2011;

Maranoa Placemaking Strategy Mitchell October 2011;

Maranoa Placemaking Strategy Roma October 2011;

Maranoa Placemaking Strategy Surat October 2011;

Maranoa Placemaking Strategy Wallumbilla October 2011;

Maranoa Placemaking Strategy Yuleba October 2011; and

Maranoa Placemaking Strategy Other Communities October 2011.

 

2.    Council endorse the positioning of Regional Entry Signs as outlined in the report.

 

3.    That the costing approach contained in this report be incorporated into Council’s Long Term Financial Plan, including accessing external funding.

 

4.    That as part of its annual operational plan, budget and capital works program, Council identify the elements of the Maranoa Placemaking Strategy that it will undertake annually;

 

5.    Council officers undertake a community engagement program to promote the Maranoa Placemaking Strategy including potential funding sources and indicative timeframes for the implementation of the plans;

 

6.    That prior to and during the implementation by Council of individual project elements of the Maranoa Placemaking Strategy, that Council officers engage with local community and project partners/stakeholders.

 

 

Body of Report:

 

Background:

The development of regional placemaking plans was identified as a priority in the Maranoa Community Plan 2020 – Pathways to our future and the associated six Local Plans 2013.  Council received funding of $10,000 under the Queensland Government’s Building Rural Communities Fund.  The purpose of the funding was to assist Council with costs associated with the engagement of a consultant to undertake research and design of regional placemaking concept plans.

 

Place Design Group’s quotation was accepted by Council. Community engagement activities were commenced with the assistance of Council’s Community Development Department during the period 20 to 24 June 2011.  Draft concept plans were presented to Council and endorsed for public release. 

 

Draft placemaking concept plans were released during the official launch of the Maranoa Community Plan 2020 and six associated Local Plans 2013 during the period 25 to 29 July 2011.  Community feedback and public comment was sought from 25 July to 16 September 2011.  A total of 109 written placemaking feedback responses were received by Council from across the Maranoa Region.  All responses were forwarded to Place Design Group and compiled into a consultation report. Public comments were reviewed and amendments made, where appropriate, to the draft placemaking concept plans. 

 

Project Purpose and Scope:

The purpose of the project was to develop, through a rigorous process of community engagement, site specific placemaking concept plans for Injune, Mitchell, Roma, Surat, Wallumbilla and Yuleba and a general concept plan for the smaller communities within the Maranoa Region.

 

As the Amby community had been allocated $20k funding from the Department of Main Roads to undertake town beautification work resulting from recent major road works within the community, a site specific plan was provided by the consultant to assist the community with this funded project.  It is not proposed that Council provide the Amby community with any additional placemaking infrastructure than that proposed for the other smaller communities within the Maranoa Region. The concept plans were provided to assist the community deliver its funded project and no additional design costs were incurred by Council.

 

Due to the budgetary allocation assigned for consultancy services for this project, it was necessary to focus the scope of the Roma placemaking concept plans on three significant areas namely town entrances, Adungadoo Pathway and Roma CBD. These areas were selected on the basis that they were identified by the community as a priority in the Local Plan 2013 – Roma, Hodgson and Muckadilla. 

 

Whilst it may appear that comparatively the placemaking plans for Roma are disproportionately smaller in scale than that of the smaller towns, it is emphasised that significant additional placemaking projects are currently in the planning phase for Roma and are being progressed outside the scope of this project. 

 

The Maranoa Placemaking Strategy concept plans are intended as aspirational long term strategic plans to guide the future direction for public infrastructure enhancement, replacement and development for townships within the Maranoa.  As funding opportunities arise, the plans may also be used by Council and community groups to support external funding applications to government agencies and other funding sources.

 

It is emphasised that the Maranoa Placemaking Strategy must be considered in conjunction with Council’s Asset Management Plan, Long Term Financial Plan and existing community infrastructure maintenance and upgrade commitments e.g. Bassett Park Development Project, Bungil Street Combined Sporting Facility and Wallumbilla Showgrounds Development Project.  It is further acknowledged that first priority will be assigned to the management of current infrastructure and facilities to safe and sustainable levels.

 

It is further emphasised that whilst the placemaking concept plans are comprehensive long term plans, they are not an exhaustive listing of all community infrastructure which may be required across the region over the next fifteen (15) to twenty (20) years, nor do they include all existing placemaking infrastructure which may need to be replaced or further developed.

 

Town Entry Signage

A standardised concept for individual town gateway treatments or entry signage has been developed to create a consistent regional theme throughout the Maranoa Region.  The proposed typical gateway treatment concept includes a surrounding canopy of natural trees with grass understory and a unique town sign.  An example of such a town gateway treatment would be a unique town sign surrounded by a cluster of the region’s iconic bottle trees.  Unique town signs will be developed in consultation with members of each respective community. 

 

A provision sum of $40,000.00 has been assigned for each major gateway treatment, however the actual cost for each individual treatment will be influenced by the final design of the unique sign while available funding may limit the extent of works. Those towns with existing town gateway signage may only require the inclusion of the surrounding landscaping elements. Hence the associated costing will be significantly reduced for these town gateway treatments. It is also anticipated that town signage for the smaller communities will not be as elaborate as those proposed for the larger communities and as such reduced cost estimates have been assigned accordingly.

 

 

 

Maranoa Region Entry Signage

The standardised concept developed for individual town gateway treatments ought to be utilised for the major gateway points into the Maranoa Region thus providing consistent branding of the region.  However the implementation of the regional gateway treatments will be subject to unique site requirements including the Department of Transport and Main Roads’ requirements relating to roadside signage and as such may require adaptation to meet such requirements.

 

Whilst there are a number of roadways through which the Maranoa Region may be accessed, the major gateway points into the Maranoa Region are located at

 

Warrego Highway – Eastern Gateway

Warrego Highway – Western Gateway

Carnarvon Highway – Southern Gateway

Carnarvon Highway – Northern Gateway

Surat - Tara Gateway

Mitchell – St George Gateway

Roma – Taroom Gateway

 

An initial provisional sum of $3,500.00 per sign has been estimated for the cost of a large steel roadside sign with colour graphics.  This estimate does not include installation costs.

 

The provision of the Regional Entry Signage is considered a priority to assist in the recognition of the Maranoa Region.

 

Concept Plan Implementation

In prioritising the scheduling and delivery of concept plan elements, Council may elect to progress those elements which have a greater impact on a larger population base within a shorter timeframe.  For example placemaking elements identified for Roma may be scheduled for delivery within a five year timeframe, whereas other placemaking elements identified as not being of a high priority may be scheduled for a longer timeframe of ten (10) to twenty (20) years.

 

Individual projects could also be divided into sub-projects and staged over several years as funding becomes available.  Furthermore, as existing infrastructure requires replacement or upgrading, such replacement or infrastructure upgrade should be undertaken with reference to the regional placemaking concept plans.

 

Council has the opportunity to identify the level of responsibility and involvement which it is prepared to assume for the delivery of placemaking elements.  For example Council may elect to assume a direct role for some elements thereby assuming full responsibility for the delivery and funding of the element, whilst with other elements Council may elect to have a partnering or advocacy role.  A partnering role may mean that Council partners with community groups or government agencies to deliver and / or fund placemaking elements.  Alternatively if Council were to assume an advocacy role, Council would have no direct role in the delivery or funding of the placemaking element. 

 

Council may also elect to scale back or re-scope placemaking elements, particularly those elements which are determined to be of a lesser priority or need. Placemaking elements could also be scoped at the community level with any additional costs funded from other external sources as opportunities arise.

 

It is acknowledge that Council’s endorsement of the Maranoa Regional Placemaking Strategy in no way commits Council to the delivery of any elements detailed in the concept plans in the short, medium or long term. It is further acknowledged that the Maranoa Regional Placemaking Strategy is aspirational and that Council’s level of responsibility and financial commitment to the delivery of plan elements will be identified annually as part of its operational planning, budgeting and capital works programming.

 

Provisional Costings

Provisional cost estimates prepared by Place Design Group for the Maranoa Placemaking Strategies for Injune, Mitchell, Roma, Surat, Wallumbilla, Yuleba and Amby are summarised in Table 1 below. However as the plans are concept plans and not detailed working drawings such costings are the consultant’s opinion of probable costs only.

 

Place Design Group did not provide provisional costings for projects detailed in the Maranoa Placemaking Strategy Other Communities October 2011.  The costings which are detailed in Table 1 for the communities of Begonia, Bymount, Dunkeld, Eumamurrin, Hodgson, Jackson, Muckadilla, Mungallala, Noonga, Teelba and Wycombe are provisional estimates only.

 

The total cost for the Maranoa Placemaking Strategy as detailed in Table 1 below is estimated at approximately $6,265,857.00.

 

Table 1 – Estimated Costings Maranoa Placemaking Strategy

 

Town

Project

 Est Cost

Total Est Cost

Injune

 

 

 

 

Upgrade to footpaths

 $        368,220

 

 

Road Pavement Treatment

 $        124,640

 

 

Cemetery

 $          11,760

 

 

Playground Apex Park

 $          20,000

 

 

Community Workshop

 $        150,000

 

 

Steam Train Site

 $          33,000

 

 

Community Shelter

 $          40,000

 

 

Gateway Treatment (1)

 $          40,000

 

 

Town Square

 $        503,557

 

 

Contingency 5%

 $          64,559

 

 

Estimated Total Placemaking Cost

 

 $       1,355,736

Mitchell

 

 

 

 

Maranoa River Walk

 $        483,864

 

 

Town Gateway Treatment (1)

 $          40,000

 

 

Street Improvements

 $        145,000

 

 

Mitchell Hall Landscaping

 $          80,000

 

 

Cambridge St Community Meeting Space

 $          68,048

 

 

Enhancement of Weir Facilities

 $          40,000

 

 

Contingency 5%

 $          42,846

 

 

Estimated Total Placemaking Cost

 

 $          899,758

Roma

 

 

 

 

Mid Block Crossing (4)

 $        638,128

 

 

Adungadoo Pathway Enhancements

 $        242,788

 

 

All Abilities Playground

 $        250,000

 

 

Gateway Treatment (3)

 $        120,000

 

 

Memorial Avenue Bollards

 $          41,968

 

 

Intersection Treatments

 $        320,000

 

 

Contingency 5%

 $          80,644

 

 

Estimated Total Placemaking Cost

 

 $       1,693,528

Surat

 

 

 

 

Town Square

 $        478,918

 

 

Riverside Amphitheatre

 $        100,000

 

 

Town Gateway Treatment

 $          40,000

 

 

Riverwalk Improvements

 $        272,000

 

 

Sports Reserve Improvements

 $        103,340

 

 

Town Footpath Network

 $        113,088

 

 

Intersection Pavement Treatments

 $        125,400

 

 

Contingency 5%

 $          61,637

 

 

Estimated Total Placemaking Cost

 

 $       1,294,383

Wallumbilla

 

 

 

 

Gateway Treatments (2)

 $          80,000

 

 

Pedestrian Paths

 $          87,588

 

 

Visitor Node Fence

 $          10,000

 

 

Community Square

 $        145,000

 

 

Public Toilets - Provisional Sum

 $          20,000

 

 

Painted Sign on Grain Shed

 $               400

 

 

Cemetery Memorial Wall

 $          20,000

 

 

Contingency  5 %

 $          18,149

 

 

Estimated Total Placemaking Cost

 

 $          381,137

Yuleba

 

 

 

 

Town Centre

 $        330,429

 

 

Town Gateway Treatment (1)

 $          25,000

 

 

Outdoor Lighting Bluelight Disco Shed

 $            3,000

 

 

Pedestrian Walkway (1/2 completed)

 $          58,125

 

 

Street Furniture Suite

 $          13,200

 

 

Contingency 5%

 $          21,488

 

 

Estimated Total Placemaking Cost

 

 $          451,242

Other Communities

 

 

 

Amby

Landscape Improvements

 $          20,000

 

 

Town Gateway Treatment

 $            5,000

 

 

Concrete Footpath

 $          19,950

 

 

Contingency 5%

 $            2,248

 

 

Estimated Total Placemaking Cost

 

 $            47,198

Begonia

 Town Signage

 $            3,000

 

 

Estimated Total Placemaking Cost

 

 $              3,000

Bymount

 Town Signage

 $            3,000

 

 

No Camping Signage

 $               500

 

 

Estimated Total Placemaking Cost

 

 $              3,500

Dunkeld

Town Signage

 $            3,000

 

 

Estimated Total Placemaking Cost

 

 $              3,000

Eumamurrin

Event Signage

 $            1,500

 

 

Water Tanks for Hall

 $       5,000.00

 

 

Upgrade of Hall Decks

 $     45,000.00

 

 

Contingency 5%

 $            2,575

 

 

Estimated Total Placemaking Cost

 

 $            54,075

Hodgson

Town Signage

 $            3,000

 

 

Estimated Total Placemaking Cost

 

 $              3,000


 

Jackson

Town Signage

 $            3,000

 

 

History Mural

 $            5,000

 

 

Estimated Total Placemaking Cost

 

 $              8,000

Muckadilla

Town Signage

 $            3,000

 

 

Estimated Total Placemaking Cost

 

 $              3,000

Mungallala

Town Signage

 $               500

 

 

Interpretative Signage

 $            2,800

 

 

Centre Median Landscaping

 $          20,000

 

 

Fencing / Shade / Furniture

 $            4,000

 

 

Contingency 5%

 $            1,365

 

 

Estimated Total Placemaking Cost

 

 $            27,300

Noonga

Town Signage

 $            3,000

 

 

Estimated Total Placemaking Cost

 

 $              3,000

Teelba

Town Signage

 $            3,000

 

 

Outdoor shaded seating area

 $            4,500

 

 

Estimated Total Placemaking Cost

 

 $              7,500

Wycombe

Town Signage

 $       3,000.00

 

 

Estimated Total Placemaking Cost

 

 $         3,000.00

 

ESTIMATED TOTAL OTHER COMMUNITIES

 

 $          165,573

REGIONAL GATEWAY TREATMENT / SIGNAGE

 

 

 

 

Regional Gateway Signage (7)

 $        24,500

 

 

Estimated Total Regional Gateways

 

 $       24,500.00

Regional Strategy

 

 

 Est. Tot. Cost

 

TOTAL MARANOA PLACEMAKING STRATEGY COST

 

 $       6,265,857

 

 

Summary:

In summary it is proposed that Council endorse the Maranoa Regional Placemaking Strategy as presented on the basis that such endorsement does not commit Council to the delivery of all or any of the elements detailed in the concept plans and that such elements may be amended by Council as deemed appropriate.

 

It is recommended that Council identify, as part of its annual operational plan, budget and capital works program those concept plan elements, if any, Council will undertake during the planning period.

 

Consultation (internal/external):

Internal:

Paul Bawden – Chief Executive Officer

Tony Klein – Director Community Services

Matthew McGoldrick – Director Corporate Services

Robert Hayward – Director Planning and Environment

Barry Omundson – Director of Operations

Fiona Vincent – Regional Sport & Recreation Coordinator

Heidi Schutt – Community Development Coordinator (Injune)

Jane Fenton – Community Development Coordinator (Mitchell

Mark McDevitt – Community Development Coordinator (Roma)

Nicola Gear – Community Development Coordinator (Surat)

Danielle Pearn – Assistance Town Planner

Julian McEwan – Operations Overseer (Roma Town)

Konrad Crawford – Parks and Gardens Foreman (Roma)

General project feedback was sought from all Council staff.      

 

Place Design Group

Department of Main Roads and Transport

 

Injune

Bymount Community Recreation Association

Eumamurrin Recreation Association

Advance Injune

CHIPS (Cultural Heritage Injune Preservation Society)

Beautification Group

Injune State School SRC (Student Representative Council)

Injune District Tourism Association

Injune SES

Injune State School P & C

Injune Kindergarten & Children’s Centre

Injune Forest Products

Injune Cypress Sawmill

Injune Churches Together

Bymount East State School P & C

Injune Bowls Club

Injune Cricket Club

 

Mitchell / Amby / Mungallala

Amby Progress Association

Mungallala Progress Association

Nalingu Aboriginal Corporation

Booringa Action Group

Booringa Heritage Museum Committee

Maranoa Retirement Village Residents

Mitchell on Maranoa Art Gallery Committee

Maranoa Health Enhancement Program (Mitchell)

Mitchell State School Student Council

 

Roma

Commerce Roma

Roma Tourism Association

Manandanji Indigenous Group

The Garvie Group

Roma Mothers Coffee Club

 

Surat

Surat Lions Club

Voice of Warroo

Surat Aboriginal Corporation

Surat & District Development Association

Cobb & Co Museum Committee

 

Wallumbilla

Wallumbilla Town Improvement Group

Wallumbilla / Surat Red Bulls

Wallumbilla Heritage Association

Wallumbilla State School P & C Association

 

Yuleba

Yuleba Development Group

Maranoa Health Enhancement (Yuleba)

Bendemere Pony Club

 

General project feedback was sought from residents of the Maranoa Region

Risk Assessment (Legal, Financial, Political etc.):

Legal: Failure to address identified traffic and pedestrian safety issues may have legal implications for Council.

Political: 

§ Potential community dissatisfaction if Council fails to endorse concept plans due to significant community input into the development of the plans.

§ Potential community division regarding several placemaking concept plan elements.

Policy Implications:

Nil

Financial Resource Implications:

Estimated total project costing $6.266 million with potential funding sources:

§ Maranoa Regional Council

§ State & Federal Governments (various funding programs)

§ Corporate funding/sponsorship

§ Community

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.4.3(a) To develop community capacity and encourage community engagement so as to address identified needs and opportunities to enhance the quality of life and wellbeing for residents of our region

Supporting Documentation:

1

Placemaking Concept Plans - Injune (Enclosure)

D11/33485

2

Placemaking Concept Plans - Mitchell (Enclosure)

D11/33484

3

Placemaking Concept Plans - Other Communities (Enclosure)

D11/33483

4

Placemaking Concept Plans - Roma (Enclosure)

D11/33480

5View

Placemaking Concept Plans - Surat

D11/36225

6

Placemaking Concept Plans - Wallumbilla (Enclosure)

D11/33478

7

Placemaking Concept Plans - Yuleba (Enclosure)

D11/33476

8

Placemaking Concept Plans - Amby (Enclosure)

D11/36005

 

Report authorised by:

Tony Klein, Director of Community Services


Attachment 5

Placemaking Concept Plans - Surat

 










Maranoa Regional Council

    

General Meeting -  14 December 2011

Officer Report

Meeting: General  14 December 2011

Date: 5 December 2011

Item Number: 15.3

File Number: D11/35958

 

Subject Heading:                     Naming of Unnamed Roads - ULDA

Classification:                                  Open Access  

Name of Applicant:                         Wolter Consulting Group

Location:                                           Bowen Street, Roma

Author & Officer’s Title:                 Jodie Young, Administration Officer

 

 

Executive Summary: 

Names are sought for three (3) unnamed Road/Lanes located in the Stage 1of the Roma Urban Development Area, Bowen Street, Roma also described as

Lot 143 on AP15786 .

 

Officer’s Recommendation: 

That Council name the roads which are outlined in the attached map as:-

1-   “Clearview Drive”

2-   “Lomandra Avenue”

3-   “Flinders Lane”

 

Body of Report:

Council has received a request from Wolter Consulting Group for street naming approval for the 3 new roads created as part of the subdivision of land within Stage 1 of the Roma Urban Development Area. The unnamed roads are required to be named before addressing numbers can be provided and to support emergency service access.

 

There is currently no adopted policy or set guidelines that outlined the procedures which should take place when naming roads within the region. In the past Council has named roads by taking into account their historical significance, for example, the original settlers, families that have been in the area for an extended period of time or families that now reside in the area.

 

The proposed naming of the roads (see Map in attachment) and rational are:-

 

1.   Clearview Drive – based on the project name as the significant street in stage one because of location to display village and will create a point of interest.

2.   Flinders Lane – Flinders Grass is a local species of flora that is specified for the stage 1 park.

3.   Lomandra Avenue – Lomandra longifolia is a local species flora that is specified for the stage 1 park.


Consultation (internal/external):

Internal:

Ken Palmer – Manager Construction and Maintenance

 

External:

Chris Hinton – Assistant Wolter Consulting Group

James Isaac – Town Planner Wolter Consulting Group

Risk Assessment (Legal, Financial, Political etc.):

Nil

Policy Implications:

There is no current adopted policy.

Financial Resource Implications:

Nil

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.5.3(c) To develop an asset replacement program for Council’s roads infrastructure assets so as to ensure sufficient funds are available to undertake any asset replacement and renewal when required without creating an unnecessary financial burden on other Council operations and in the interest of long term sustainability.

Supporting Documentation:

1View

Cover letter and Map of Roads to be named

D11/35955

 

Report authorised by:

Barry Omundson, Director Infrastucture


Attachment 1

Cover letter and Map of Roads to be named

 



Attachment 1

Cover letter and Map of Roads to be named

 


Maranoa Regional Council

    

General Meeting -  14 December 2011

Officer Report

Meeting: General  14 December 2011

Date: 4 December 2011

Item Number: 15.3

File Number: D11/35853

 

Subject Heading:                     Outback, Gulf & Western Downs Tourism Opportunity Plan

Classification:                                  Open Access  

Name of Applicant:                         Tourism Queensland

Location:                                          

Author & Officer’s Title:                 Edward Sims, Manager Organisational Performance

 

 

Executive Summary: 

Tourism Queensland has developed the draft Outback, Gulf & Western Downs Tourism Opportunity Plan and seeks Council’s feedback on the plan before its finalisation.

 

 

Officer’s Recommendation: 

That Council provides feedback to Tourism Queensland to seek amendment of the draft Outback, Gulf & Western Downs Tourism Opportunity Plan in accordance with:

I.    Inclusion of the Great Artesian Spa as a Catalyst Project or at a minimum included in the document as a Precinct Project.

II.    Recognition of Mt Moffat (in the Maranoa Regional Council area) as part of the Carnarvon National Park and tourism opportunities for this portion of the National Park included in the Precinct Projects section of the Plan.

III.   Inclusion of the Surat Cobb & Co. Changing Station as a Precinct Project in the Plan.

IV.  Removal of ‘Mitchell’ in commentary on page 2 of the Plan referring to South West Outback.

V.  Removal of reference to the ‘River’ adjacent the Romavilla Winery on page 33 of the Plan.

VI.  Inclusion of a disclaimer for Council assets identified in the Plan as it relates to Council’s financial responsibility to implement elements of the Plan.

VII. Inclusion of relevant tourism/visitor related projects not currently cited in the Precinct Projects section of the Plan that have been previously identified in key Council planning documents such as:

o Maranoa Community Plan

o Local Community Plans (x6)

o Regional Visitor Strategy

o Regional Sport & Recreation Strategy

o Regional Trails Strategy

o Regional Placemaking Plans

Body of Report:

Tourism Queensland has developed the draft Outback, Gulf & Western Downs Tourism Opportunity Plan (TOP) and seeks Council’s feedback on the plan by 13 January 2011.  The TOP has been over a year in the making involving desk top research and consultation with local government, community and tourism industry stakeholders.

The purpose of the TOP is to provide direction for the ongoing sustainable development of tourism in the Outback, Gulf & Western Downs through the identification of new and upgraded tourism products and programs that build on the competitive advantages of the region and meets the needs of current and future visitor expectations.

The TOP recommends 22 destination specific Catalyst Projects and 14 Region-wide projects which are considered the standout opportunities that will drive ongoing tourism growth across the region. In addition, the TOP profiles a suite of projects for each precinct and local government area across the region which underpin the marquee Catalyst and Region-wide projects.

This plan is not a statutory document and does not impose an agenda on Council to follow nor is it meant to hold Council to be accountable.  Moreover it is intended to be a guide and assistance to obtain investment in projects if they become priorities.

Maranoa Projects included in TOP.

The TOP identifies three 3 categories of projects to achieve the vision of “a world class destination”:

 

1.   Catalyst projects are key infrastructure projects that each sub-region has identified and included for the Maranoa is: 

a.   Big Rig re-development.

 

2.   Region wide projects are projects that may have relevance across the entire state but according to out tourism strategy, may or may not have a relevance to the Maranoa e.g.

a.   coordinated events strategy

b.   integrated camping and caravan park strategy

c.   Paddock to plate project

 

3.   Precinct projects are projects that each sub-region has named as important to its tourism market development and included for the Maranoa are:

a.   Romavilla Winery promotion

b.   energy sector VFR packages

c.   conference packages

d.   regional drive trails

e.   sale yard tours

f.    indigenous interpretive tours

 

 

 

 

Proposed amendments to TOP

 

It is recognised that the TOP will guide State planning and funding opportunities for tourism projects for the next 5 years.  Accordingly it is important that all tourism projects irrespective of priority be included in the document.

 

Accordingly it is proposed to propose the following amendments in Council’s response to the draft TOP.   

 

I.    The Great Artesian Spa be included as a Catalyst Project or at a minimum included in the document as a Precinct Project.

II.    Recognition of Mt Moffat (in the Maranoa Regional Council area) as part of the Carnarvon National Park and tourism opportunities for this portion of the National Park included in the Precinct Projects section of the Plan.

III.   Inclusion of the Surat Cobb & Co. Changing Station as a Precinct Project in the Plan.

IV.  Removal of ‘Mitchell’ in commentary on page 2 of the Plan referring to South West Outback.

V.  Removal of reference to the ‘River’ adjacent the Romavilla Winery on page 33 of the Plan.

VI.  Inclusion of a disclaimer for Council assets identified in the Plan as it relates to Council’s financial responsibility to implement elements of the Plan.

VII. Inclusion of relevant tourism/visitor related projects not currently cited in the Precinct Projects section of the Plan that have been previously identified in key Council planning documents such as:

o Maranoa Community Plan

o Local Community Plans (x6)

o Regional Visitor Strategy

o Regional Sport & Recreation Strategy

o Regional Trails Strategy

o Regional Placemaking Plans

At a Council workshop conducted on 30 November 2011, the draft TOP was presented and discussed, and the recommendations of this report reflect those discussions and guidance from Council.

Consultation (internal/external):

·    Councillors (workshop 30 November 2011)

·    Robert Hayward, Director Planning & Environment

·    Tony Klein, Director Community Services

Risk Assessment (Legal, Financial, Political etc.):

Addressed proposed amendment six (VI) of this report - Inclusion of a disclaimer for Council assets identified in the Plan as it relates to Council’s financial responsibility to implement elements of the Plan.

Policy Implications:

Nil

 

Financial Resource Implications:

Undetermined and addressed through annual budget considerations and funding sourced.

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.4.2(a) To identify and implement actions that facilitates the development of the regional tourism industry.

Supporting Documentation:

1View

Outback Gulf and  Western Downs Tourism Opportunity Plan Draft for consultation

D11/35852

 

Report authorised by:

Robert Hayward, Director Planning & Environment


Attachment 1

Outback Gulf and  Western Downs Tourism Opportunity Plan Draft for consultation

 











































Maranoa Regional Council

    

General Meeting -  14 December 2011

Officer Report

Meeting: General  14 December 2011

Date: 7 December 2011

Item Number: 15.4

File Number: D11/36473

 

Subject Heading:                     Revocation of Trusteeship of the Recreation Reserve and Reserve for Local Government purposes - McDowall St, accross from the Hospital

Classification:                                  Open Access  

Name of Applicant:                         Urban Land Development Authority

Location:                                           McDowall Street Roma - accross from the Hospital

Author & Officer’s Title:                 Matthew McGoldrick, Director of Corporate Services

 

Executive Summary: 

Council requested that the decision on the recommendation in the report of the 30th September, 2011 be held over until further information could be obtained concerning the Car Park on the Reserve, including the issue of funding.

 

 

Officer’s Recommendation: 

That the ULDA be advised that the trusteeship of the Reserves will be surrendered on the basis that the existing well utilised car park remain as a public car park for people accessing the Roma Hospital and that the Reserves be returned to Council as a Local Government Reserve and a Recreation Reserve, with Council the boundary of the Local Government Reserve to surveyed such that it will incorporate the Car Park.

 

 

Body of Report:

Councillors considered the request from the ULDA at the General Meeting of the 30th September, 2011. At that meeting some of the discussions concerned the use of the existing car park near the playground and the funding of the original car park.

 

Council records for the period of time are currently not able to be accessed as they are being converted to the new records system. The manual file is in Mitchell and would be able to be easily located. The rates clerk who was on staff at the time, Dale Waldron advised that the Car Park was at least 10 years old and that he was not aware that Council obtained funds from Queensland Health to construct the Car Park. If there had been a funding arrangement between Council and Queensland Health, then Queensland Health has benefitted greatly from the provision of the funding over the years of existence of the Car Park.

 

 

 

The current Car Park at the Roma Hospital on the Hospital land is grossly inadequate and this means that the car park across the road and the on street parking is very well used. There are more developments under construction and contemplated for the Hospital site which will probably make the parking problem worse.

 

The park next to the existing Public Car Park at the hospital is dedicated to a former staff member of the Roma Hospital and is well maintained. The park has almost no infrastructure which would prevent conversion to an extension of the existing car park on the hospital land. Negotiations or discussions could commence with Queensland Health about the usefulness or identification of the purpose of the park on the hospital site. If Queensland Health did convert that to a Car Park that would be the time for Council to consider removal of the Car Park on the Council Reserve. Council could also request the ULDA to utilise it’s powers to indicate to the Hospital that they need to solve their parking problem on site in order that the park can be utilised as park.

Consultation (internal/external):

Customer Service Co-ordinator Dale Waldron

Nil external consultation

Risk Assessment (Legal, Financial, Political etc.):

Nil

Policy Implications:

Meets Policy

Financial Resource Implications:

Recommendation would not add costs to Council

 

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.2.4(a) To maintain and present Council’s community facilities in a manner appropriate to the standard expected by users for each respective facility within budgetary constraints whilst considering organisational sustainability.

Supporting Documentation:

Nil

 

  


Maranoa Regional Council

    

General Meeting -  14 December 2011

Officer Report

Meeting: General  14 December 2011

Date: 9 December 2011

Item Number: 15.5

File Number: D11/36917

 

Subject Heading:                     Tender for the Management of the Mitchell Spa and Tender for the Recontruction of the Mitchell Spa or Construction of a New Spa

Classification:                                  Open Access  

Name of Applicant:                        

Location:                                           Cambridge Street, Mitchell

Author & Officer’s Title:                 Matthew McGoldrick, Director of Corporate Services

 

Executive Summary: 

The Mitchell Spa Management Agreement with Alan Male ends on the 22nd January 2012. The agreement has been in place for two years. The Mitchell Spa Management Agreement will be Tendered in January 2012, the current arrangement will be extended on a month by month basis until a decision can be made about the successful Tenderer.

The Tender for the works at the Mitchell Spa will be let at the same time.

The intention is to request Tenders for the construction works to provide Tenders to enable Council to assess the options of as is where is or construction of a new Spa in the grounds of the new swimming pool.

 

 

Officer’s Recommendation: 

That Council Tender for the Management of the Mitchell Spa and associated facilities in two parts and Council also Tender for the replacement or refurbishment of the Existing Spa and that tenders be assessed together to achieve the best long term result for Council.

 

 

Body of Report:

Management Contract

The Management Agreement of the Mitchell Spa ceases on the 22nd January 2012. The Agreement is to provide for the good management of the Centre and ensure that the facility is maintained and managed to the highest possible standard and to ensure the continued access for the residents of Mitchell to high quality swimming facilities. The Contractor has the sole right during the Term of the Agreement to conduct the business of the Centre. The Centre means the Mitchell Memorial Swimming Pool and Great Artesian Spa complex located on the Land and including the fixtures, fittings, swimming pools, amenities, visitor information centre, merchandise outlet, Healthbyte Internet Café, Booringa Fun and Fitness, pool canteen and the Mitchell Shire Hall.

 

Council is responsible for the following:

(i) The Electricity Costs for the Centre;

(ii) All telephone charges necessary for the efficient running of the swimming

pool provided however the Contractor shall keep a record of all telephone

calls made and be responsible for payment of telephone calls of a private

nature;

(iii) The maintenance of all buildings and plant within the Centre;

(iv) The supply of all chemicals and cleaning materials required for efficient

operation of the Swimming Pool, Spa and buildings;

(v) The provision of lawn mowers and other gardening equipment to the

Contractor to use for the maintenance of the Centre;

(vi) All water, sewerage and refuse charges for the Swimming Pool, Spa and

buildings;

(vii) All general insurance for the improvements, plant, equipment and chattels

owned by the Council within the Centre;

(viii) The provision of all health and hygiene consumable items for the centre

with exception of the merchandise outlet and café.

(ix) Securing and paying fees associated with an annual Australasian

Performing Rights Association (APRA) licence for public performance,

broadcast or communication of music.

In addition to these responsibilities Council pays the Contractor $199,865.60 per annum and the contractor also retains all sales income and admission fees.

 

Council will be Tendering this contract in the new year. It is intended to request Tenders to submit a Tender based on providing the same services in the same locations or Tender based on splitting the contract in two on the basis that over the long term savings could be made by combining the Spa in the grounds of the swimming pool.

 

Refurbishment/Construction

Council have set aside $180,000 in the Budget based on the price to refurbish the Spa in the current location. Council have also been successful in receiving a Grant $110,000 from the Commonwealth Department of Resources, Energy and Tourism. At this stage the total Budgeted expenditure allowable for the Spa is $290,000.  This additional funding will allow Council to consider construction of a new Hot Water Spa in the grounds of the swimming pool which had been the intention with the overall site master plan. Pipes, filtration equipment, electrical and a heater were all catered for the spa when the new swimming pool was constructed. However, only rough prices have been obtained for a new Spa and to safeguard against the possibility of price escalation Council will advertise tenders in two parts (1) refurbish and upgrade the existing Spa and (2) construct a new Spa in the grounds of the swimming pool.

 

If the option of including the Spa in the grounds of the swimming pool is within the current Budget then consideration needs to be given to the how the management contract/s for the management of the pool facilities and the gym, hall and cafe are structured. There may be cost savings in a reduction in the amount of pool supervision requirements*. The advice to date has been that the savings to Council are significant. It is intended to assess the management contract and the construction contract in a way that achieves the best long term result for Council. Tenderers will be advised of this whether the proponent is tendering for the management contract or the construction contract.

 

*Management Fee (indicative)

The projected management fee for the Roma Pool for 48 weeks of the year will be approximately $57,500 per annum. While the attendance at the Roma would in all likelihood be higher and thus assist in keeping the management fee down this may be an appropriate benchmark to use for the management of the Mitchell facility if the Spa and Pool were in one facility.

Consultation (internal/external):

Paul Bawden Chief Executive Officer, Tony Klien Director Community Services

External consultation with contractors to obtain refurbishment prices

Risk Assessment (Legal, Financial, Political etc.):

To reduce the long term risk of refurbishing the Spa only for it to fail again and cost Council more to refurbish, the option of constructing a new Spa with different materials needs to be considered. Management and supervision fees may also be reduced if a new pool is constructed. 

Policy Implications:

Mil

Financial Resource Implications:

Budget for the Project is $290,000. The Management Fee Budget is currently $200k pa.

 

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.2.4(a) To maintain and present Council’s community facilities in a manner appropriate to the standard expected by users for each respective facility within budgetary constraints whilst considering organisational sustainability.

Supporting Documentation:

1View

Mitchell Pool & Spa Management Agreement Alan Male and Associates

D10/16526

 

Report authorised by:

Paul Bawden, Chief Executive Officer


Attachment 1

Mitchell Pool & Spa Management Agreement Alan Male and Associates