Description: Maranoa Logo Process

Late Items

Business Paper

 

General Meeting

 

Wednesday 22 May 2013

 

Roma Administration Centre

 

NOTICE OF MEETING

 

Date: 22 May 2013

 

 

Mayor:                                                    Councillor R S Loughnan

 

Deputy Mayor:                                        Councillor W S Wason

Councillors:                                             Councillor J L Chambers

                                                              Councillor R J Denton

                                                              Councillor P J Flynn

                                                              Councillor W M Newman

                                                              Councillor C J O’Neil

                                                              Councillor M L Price

                                                              Councillor D J Schefe

 

Chief Executive Officer:                            Ms Julie Reitano

 

Senior Management:                                Mr Tony Klein (Director Community & Commercial Services)

                                                              Mr Michael Parker (Acting Director Infrastructure Services)

                                                              Mr Rob Hayward (Director Development, Facilities & Environmental Services)

 

Officers:                                                  Ms Jane Frith (Coordinator Corporate Communications)

 

Please find attached agenda for the General Meeting to be held at the Roma Administration Centre on May 22, 2013 at 9.00am.

Julie Reitano

Chief Executive Officer

 


Maranoa Regional Council

    

General Meeting -  22 May 2013

TABLE OF CONTENTS

Item       Subject

No

  

L            Late Items

L.1        Application for Material Change of Use - "Extractive Industry" and Environmentally Relevant Activity 16 3(a) - Extraction and Screening Activities.............. 2

Prepared by:      Rebecca Van der Meer, Town Planner

Attachment 1:     Body of Report........................................................................... 9

Attachment 2:     Plan of Development............................................................... 22

Attachment 3:     DEHP Conditions of Approval............................................... 23   

 


Maranoa Regional Council

    

General Meeting -  22 May 2013

Officer Report

Meeting: General  22 May 2013

Date: 9 May 2013

Item Number: L.1

File Number: D13/18315

 

Subject Heading:                     Application for Material Change of Use - "Extractive Industry" and Environmentally Relevant Activity 16 3(a) - Extraction and Screening Activities

Classification:                                  Open Access  

Name of Applicant:                         B. Harvey & Sons Pty. Ltd.

Location:                                           Blythdale Road, Blythdale QLD 4455 (Lot 77 on Plan WV975, Lots 88, 89, 94 & 95 on Plan WV456 and Lot 129 on Plan WV908)

Author & Officer’s Title:                 Rebecca Van der Meer, Town Planner

 

Executive Summary:  The application seeks a Development Permit for a Material Change of Use – “Extractive Industry” and Environmentally Relevant Activity (ERA) 16 3(a) – Extraction and Screening Activities on land located at Blythdale Road, Blythdale QLD 4455, described as Lot 77 on Plan WV975, Lots 88, 89, 94 & 95 on Plan WV456 and Lot 129 on Plan WV908.

                                                                                                 

The application is subject to Impact Assessment and assessed against the relevant provisions of the Bungil Shire Planning Scheme.  No submissions were received during the public notification period (12 April 2013 - 3 May 2013).

 

 

Officer’s Recommendation:  Council approve the application for Material Change of Use – “Extractive Industry” and Environmentally Relevant Activity (ERA) 16 3(a) on land at Blythdale Road, Blythdale QLD 4455, described as Lot 77 on Plan WV975, Lots 88, 89, 94 & 95 on Plan WV456 and Lot 129 on Plan WV908, subject to the following conditions:

 

Preamble

 

1.      Refer to http://www.cmdg.com.au for the Capricorn Municipal Development Guidelines (CMDG).

 

Complete and Maintain

 

1.      Complete and maintain the approved development as follows: (i) in accordance with development approval documents and (ii) strictly in accordance with those parts of the approved development which have been specified in detail by the Council or Referral Agency unless the Council or Referral Agency agrees in writing that those parts will be adequately complied with by amended specifications.

 

2.      Complete and maintain all operational, building and plumbing and drainage work associated with this development approval, including work required by any of the development approval conditions.

 

3.      Maintain the approved development being Material Change of Use – “Extractive Industry” and Environmentally Relevant Activity (ERA) 16 3(a) in accordance with the approved plans:

 

Plan/Document number

Plan/Document Name

Date

12225701 Issue A           

Site Working Areas and Access

20/03/2013

122257- SBMP Rev C

Site Based Management Plan       

02/2013

 

Operations of Approved Use

 

4.      All development approval conditions related to the establishment of the approved development must be fulfilled prior to any approved use commencing.

 

5.      All approved uses must be carried out in accordance with the approved Site Based Management Plan.

 

Stormwater and Drainage

 

6.      Stormwater must not be allowed to pond on the development site during the development process and after development has been completed unless the type and size of ponding has been agreed in writing by the Council or as a specific development approval condition.

 

7.      There must be no increases in any silt loads or contaminants in any overland flow from the development site.

 

Erosion Control

 

8.      All construction works on site are to be undertaken in accordance with the Institute of Engineers (Australia) (IEAUST) Soil Erosion and Sediment Control Engineering Guidelines for Queensland Construction sites and the CMDG Design Guidelines – D7. 

 

9.      Measures shall be applied to prevent site vehicles tracking sediment and other pollutants onto adjoining roads and to prevent dust nuisance.

 

10.    Should it be necessary for the road and/or drainage system to be reinstated or cleaned up due to erosion and/or sedimentation from the site, then such works shall be undertaken at no cost to Council. 

 

Services Provisions

 

11.    The development site shall have a temporary, transportable effluent disposal facility at all times during the operation of the use.

 

Rubbish Collection

 

12.    At all times while the use continues, waste containers shall be maintained in a clean and tidy state and shall be emptied and the waste removed from the site on a regular basis.

 

Access, Roads, Landscaping and Lighting

 

13.    All weather vehicle access shall be provided for traffic movement within the development site

 

Use of Local Government Roads

 

14.    The developer must ensure that the roads are safe for the type of vehicles being used. If road trains are being used on local government roads other than the Mt Saltbush Road, the developer must provide advice in writing from a suitably qualified RPEQ engineer that the local government roads to be used are safe for the type of road trains to be used on those roads.

 

15.    Prior to the commencement of the use of each road, the developer must provide Council with a road condition assessment report prepared by a RPEQ qualified to make the assessment. This assessment report must be provided for each local government road to be used by the developer for the haulage of extracted materials. The assessment does not need to include Mt Saltbush Road.

 

16.    Each year, the developer is to provide the Council with an updated road condition assessment report for the local roads being used.

 

17.    The developer is responsible for the repair of damage to roads caused by the operation the extractive industry. If there are other road users who have also contributed to the damage of the roads, the costs of repairs will be on a proportional basis. The proportion of damage attributable to the developer will be as assessed by the Council unless the developer can prove otherwise.

 

18.    Any damage to roads and infrastructure, that is attributable to the progress of works on the development site or to vehicles associated with the development of the site, shall be repaired to at least the previous condition and at no cost to Council or, if the Council agrees, the cost of repairs may paid to Council for the Council to carry out the repairs.  It is the developer’s responsibility to document by photographs the previous condition of existing roads and infrastructure and to supply Council with a digital set of these photographs prior to any works commencing

 

19.    The responsibility for the repair of damage to roads caused by vehicles associated with the extractive industry is separate to the contributions required for the establishment costs associated with the use of local government roads.

 

Road Infrastructure Establishment Costs Contributions

 

20.    Infrastructure establishment costs are to be paid in accordance with this condition:

 

(a)     Why the condition is required:

 

          The condition is required because the development is outside of the Priority Infrastructure Areas of the Bungil Planning Scheme administered by the Maranoa Regional Council. The development will impact on the local roads. It will impact on the local roads because up to 100,000 tonnes per annum will be carried from the extractive industry site along local roads.

 

(b)     Amount of the payment required:

 

          The payment required is 20 cents per tonne of extractive material carried.

 

          This amount will be reviewed on an annual basis in conjunction with an assessment of the condition of the local government roads being used by the developer.

 

          The standard of road to be funded by the establishment costs contributions is the standard which allows for the safe carriage of extractive materials while optimising the maintenance costs of the road.

 

          In addition, further payments for establishment costs are required if the developer chooses to operate road trains on local government roads other than the Mt Saltbush Road. The amount of this payment is the cost of undertaking the work necessary to make the local government roads, being used by road trains carrying extractive material from the site, safe for road train use.

 

(c)     Details of the infrastructure for which the payment is required:

 

          Establishment costs of the following trunk infrastructure made necessary by the development –

·            Local government roads used by the developer to transport extracted material

·             Upgrading of local government roads to the standard necessary for the safe operation of road trains

 

(d)     When the payment must be made:

 

          The payment must be made within 14 days of the end of each quarter.

 

(e)     Person to whom the payment must be made:

 

          Maranoa Regional Council

 

(f)      The applicant may elect to supply all or part of the infrastructure instead of making payment for the infrastructure to be supplied. If the applicant makes an election to supply all or part of the infrastructure required, the infrastructure must be supplied before the use commences. The standards applying for the provision of the infrastructure are those set out in the applicable planning scheme, the Capricorn Municipal Development Guidelines and the latest standards for other matters as set out in legislation.

 

Records of Extractive Industry and Road Use

 

21.    The developer is to maintain records of all heavy vehicles and the loads being transported from the site and provide Council with a summary within 14 days of the end of every quarter.

 

22.    The developer is to provide Council with a summary of all returns that are made to the Department of Environment and Heritage Protection (DEHP) for the extraction of material from the site within 14 days of the end of every quarter.

 

23.    The developer is to provide Council with access to the original records used to create the quarterly summaries if requested by the Council for verification purposes

 

Infrastructure Agreements

 

24.    The developer may request that the Council enter into an infrastructure agreement(s) that may include any of the matters contained in the conditions of this approval. The infrastructure agreement may vary the conditions of the approval to the extent agreed by the Council providing those variations are generally in accordance with the conditions.

 

Avoiding Nuisance

 

25.    All lighting of the site, including temporary lighting, shall be such that the lighting intensity does not exceed 8.0 lux at a distance of 1.5 metres from the site at any property boundary.

 

26.    No nuisance is to be caused to adjoining properties and occupiers by the way of smoke, dust, rubbish, contaminant, stormwater discharge or siltation at any time, including non-working hours.

 

27.    The approved development and the premises shall be maintained in a clean and tidy condition.

 

28.    Unsealed internal roads are to be watered upon receipt of any complaint regarding dust nuisance caused by vehicle movements to and from the site, as determined by and to the satisfaction of Council.

 

Latest versions

 

29.    Where another condition refers to a specific published standard, manual or guideline, including specifications, drawings, provisions and criteria within those documents, that condition shall be deemed as referring to the latest versions of those publications that are publicly available at the time the first operational works or compliance approval is lodged with the assessment manager or approval agency for those types of works to be performed or approved, unless a regulation or law requires otherwise.

 

No Cost to Council

 

30.    The developer is responsible for meeting all costs associated with the approved development unless there is specific agreement by other parties, including the Council, to meeting those costs.

 

31.    Any conflicts associated with proposed and existing services shall be forwarded by the developer to the appropriate controlling authority for approval for any proposed changes.

 

32.    All civil and related work shall be designed and supervised by Registered Professional Engineers of Queensland (RPEQ) who are competent in the construction of the works.

 

 

Body of Report:

Refer to Attachment 1.

Consultation (internal/external):

-     Department of Environment and Heritage Protection (Concurrence Agency)

-     MRC Development Engineer (Internal)

-     MRC Compliance Specialist (Internal)

-     Public Notification was carried out in accordance with the requirements of SPA.

Risk Assessment (Legal, Financial, Political etc.):

The applicant has appeal rights under SPA against any decision of Council.

Policy Implications:

The application generally accords with the provisions of the Bungil Shire Planning Scheme.

Financial Resource Implications:

And conditions imposed will be at the cost of the developer.

 

Link to Corporate Plan:

Corporate Plan 2009-2013 8.3.1(a) Regulate and control development in a consistent and responsible manner that enhances the lifestyle of our community whilst promoting sustainable development.

Supporting Documentation:

1View

Body of Report

D13/18316

2View

Plan of Development

D13/18321

3View

DEHP Conditions of Approval

D13/18158

 

Report authorised by:

Danielle Pearn, Coordinator - Planning

Robert Hayward, Director- Development, Facilities & Environmental Services


Attachment 1

Body of Report

 

1.0       Background information

 

The application seeks approval for a Material Change of Use for “Extractive Industry” to permit the extraction and subsequent screening of sand adjacent to Blyth Creek at Blythdale. The proposed use involves the screening of approximately 10,000 tonnes of material per annum and constitutes Environmentally Relevant Activity (ERA) 16 3(a) - Extractive and Screening Activities (5000 - 100,000 tonne per annum).

 

The applicant currently holds a permit for ERA 16 1(a): dredging 1,000 tonne of material from the bed of naturally occurring surface waters in a year.    The proposed development will enable the applicant to screen the extracted material on the adjoining land.

 

The subject site is situated at Blythdale Road, Blythdale QLD 4455, described as Lot 77 on Plan WV975, Lots 88, 89, 94 & 95 on Plan WV456 and Lot 129 on Plan WV908.  The site is zoned Rural and is primarily used for grazing purposes.  All allotments are currently vacant with the exception of Lot 95 on Plan WV456 which is occupied by a single dwelling.  The development will not affect the ability of the site to continue to be used for agricultural purposes.

 

Figure 1 – Site Locality                                                                      Source: Bungil Shire Planning Scheme

 

Operations of the activity will be carried out with the use of mobile machinery including a truck, trailer and trommel screener.   Working areas will be located a minimum distance of 50 metres but no more than 250 metres from the creek bank and will expand across an area of approximately 100m2.  The proposed use is expected to operate eight hours per day, six days per week.  It is anticipated the activity will be carried out by two employees.

 

Vehicle access to the extraction and screening sites will be obtained via the existing property accesses to Mt Saltbush Road and Blythdale Road.  The primary haul route from the site will be via Mt Saltbush Road from the extraction sites along Blythdale Road.  It is anticipated that Blythdale Road will be used to a lesser extent to access the Warrego Highway.

 

2.0       Definition of use and assessment status

 

The Bungil Shire Planning Scheme 2006 defines the proposed use as "Extractive Industry” which is described as follows:

 

“Extractive Industry” means any premises used for the winning or treatment of the land or on adjacent land, of gravel, rock, sand, soil, stone, or other similar materials. The term does not include the removal of material authorized by Section 106(1) of the Local Government Act 1993, or mining within the meaning of the Mineral Resources Act 1989. Transport Infrastructure Act- extraction of material from roadway.

 

The application is subject to Impact Assessment and assessed against the relevant provisions of the planning scheme.  Public Notification was carried out from 12 April 2013 to 3 May 2013.  No submissions were received during this period.

 

3.0       Assessment against the planning scheme

The Desired Environmental Outcomes (DEOs) are based on ecological sustainability established by Sustainable Planning Act 2009, and are the basis for the measures of the planning scheme.  The DEOs are examined below:

 

(a) Environment

 

(i)   The areas of high scenic amenity, remnant vegetation, wetlands, fauna habitats and wildlife corridors and regionally significant open space in the Shire are protected.

 

The development site is mapped as containing significant vegetation and protected areas located adjacent to the creek, roadways and in various pockets across the site.  The DEHP conditions of approval limit the disturbance area of the screening sites and restrict the operations of the use to existing cleared land and roads in order to protect areas of environmental significance.

 

(ii)  Places, areas or sites identified as being susceptible to land degradation, including contamination, erosion, salinity and landslip, are protected and further degradation is minimised.

 

The development site is not identified as being susceptible to land degradation.   

 

(iii) Ecological sustainability is achieved by maintaining and improving biodiversity, water and air quality.

 

The development will be limited to a maximum disturbance area of eight hectares across eight screening sites.  The development will operate in accordance with a Site Based Management Plan and conditions of approval imposed by DEHP to minimise environmental impacts of the use. 

 

(iv) Places of historical and indigenous cultural heritage and social significance are protected, maintained and enhanced.

 

The subject site is not identified as being in proximity to, or a place of, historical, cultural or social significance. 

 

(b) Economic

(i)   Good Quality Agricultural Land is protected as a major economic resource for the region.

 

The development site is identified as Good Quality Agricultural Land, however the proposed use will be contained within small working areas of approximately 100m2 and involves minimal relocatable equipment and no permanent buildings or structures.  The proposed use will not adversely impact on the ability of the site to continue to be used for agricultural purposes.

 

(ii)  Key Resource Areas, extractive resources, petroleum, gas and mineral resources are protected as a major economic resource for the region.

 

The proposed development involves an extractive industry use that will produce and supply sand to the community and wider region. 

 

(iii) Industry, business and employment opportunities are improved and appropriately located to service the community and region, and encourage economic activity within the local area.

 

The proposed use will service the community and wider region by providing an essential resource for development within the region.  

 

(iv) Rural business opportunities are improved to protect and value-add to the existing rural based economy.

 

The proposed development will not adversely impact on rural business opportunities.

 

(c)  Community Well-Being & Lifestyle

(i)   A convenient access to roads and services is achieved through well located land uses and the efficient use and timely provision of infrastructure such as water, sewerage and roads walkways and cycling facilities.

 

Vehicle access to the development sites on Blythdale Road will be gained primarily via Mt Saltbush Road which is currently in high use due to the resources industry activities occurring in the surrounding area.  It is proposed that Blythdale Road will also be used to access the site on an occasional basis from the Warrego Highway.

 

The development does not require sewerage disposal, electricity or water supply due to the mobile nature of the activity and therefore will not impose any additional loads on these infrastructure networks.

 

(ii)     Rural residential and urban residential development occurs in distinct localities that provide a sense of community, amenity, services, and a safe, affordable living environment, whilst maintaining rural amenity.

 

The proposed development is for an extractive industry use and does not involve rural residential or urban residential development.

 

(iii) Infrastructure networks such as road and rail, water cycle and electricity infrastructure are protected from encroachment by sensitive land uses which may adversely affect or limit the normal operation of that infrastructure.

 

The proposed use is an industrial activity and does not involve a sensitive land use.  The development therefore will not adversely impact on the current or future operation of existing road, rail, water supply or electrical infrastructure networks in this respect.  

 

(iv) The role and identity of Injune as the main business and community centre of the shire is consolidated.

 

The proposed development is appropriately located within the Rural Zone, distant from the Injune Township.  The development will not prejudice the role and identity of Injune as the main business and community centre within the shire.

 

(v) Adverse effects from natural and other hazards, including bushfires are minimised.

 

The development site is not identified as being susceptible to natural or other hazards, including bushfires.  Nevertheless the development does not involve the installation of any permanent buildings or structures and therefore all equipment and machinery required for the use, could be easily relocated if a hazardous event were to occur.

 

(v)  The range of housing types, services and facilities meets the needs of the community and other uses.

 

The proposed development is for an industrial activity that will provide an essential resource for development within the region. 

 

 

Overall Outcomes for Rural Zone Code

The Rural Zone Code identifies overall outcomes providing direction about relevant assessment issues.  The overall outcomes for the Rural Zone Code are the purpose of the code which seeks to ensure that development within the rural zone:

 

(a)  reflects the economic potential of the rural area;

 

The proposed development will enhance the economic potential of the rural area by providing essential materials for the continued development of the region.

 

(b) is appropriately located within the Rural Zone and existing and future Rural Activities are not prejudiced by inappropriate development;

 

The proposed development will be confined to eight screening sites comprising a maximum disturbance area of eight hectares.  The activity involves minimal equipment that will not be permanently established on the site.  The development is a small scale use and will not prejudice existing or future rural activities in the locality.

 

(c)   maintains the environment, including soil, air and water, compatible with healthy natural systems and ensures public health and safety;

 

The proposed development will be required to be carried out in accordance with the conditions imposed by the Department of Environment and Heritage Protection for ERA 16 - Extractive and Screening Activities. It is considered that compliance with these conditions will minimise adverse environmental impacts.     

 

(d)  protects Good Quality Agricultural Land (GQAL) from fragmentation, alienation or encroachment of incompatible land uses in accordance with State Planning Policy 1/92 – “Development and Conservation of Agricultural Land”;

 

The development site is identified as Good Quality Agricultural Land, however operations of the activity will be confined to specific sites comprising only a small portion of the total site area and no permanent buildings or structures will be established as a result of the use.  The development will not adversely impact on the ability of the remaining site area to continue to be used for agricultural purposes.

 

 (e) is located, designed and operated in a manner that protects and enhances the predominant rural scale, intensity, form and character;

 

The proposed development will be confined to designated areas within the site and is limited in scale to a maximum disturbance area of eight hectares.  The activity involves the use of minimal equipment and will not result in the establishment of any permanent buildings or structures onsite.  The primary use of the site will remain agriculture and therefore the development will maintain the rural scale, intensity, form and character.

 

(f)    maintains the rural amenity;

 

The proposed development is for an industrial use located within a rural area.  The development will be confined to designated areas within the site and will allow the existing agricultural activities to continue as the primary land use.  The development will not adversely impact on rural amenity.

 

(g)  does not prejudice or impact adversely on other uses including those within other Zones;

The proposed use will be confined to a small portion of the total site area and will not affect the ability of the site to continue to be used primarily for agricultural purposes.  It is considered that subject to the recommended conditions of approval and the DEHP requirements, the proposed development will not prejudice or adversely impact on other uses, including established uses within other Zones.

 

(h)  has an appropriately designed access to the road network and traffic generated by the development does not impact adversely on the local road network;

 

Vehicle access to the extraction and screening sites will be obtained via the existing property accesses to Mt Saltbush Road and Blythdale Road. Conditions will be imposed to take account of the potential impacts on the local road networks

 

(i)    protects areas and sites of conservation importance, including cultural and high landscape values;

 

The development site is mapped as containing significant vegetation and protected areas located adjacent to the creek, roadways and in various pockets across the site.  The DEHP conditions of approval limit the disturbance area of the screening sites and restrict the operations of the use to existing cleared land and roads in order to protect areas of conservation importance.  The development site does not contain and is not located in proximity to places identified as being of cultural significance and therefore the use will not impact on such places.

 

(j)    is undertaken in an orderly and logical sequence to achieve an efficient provision of infrastructure;

 

The development does not require effluent disposal, water or electricity supply due to the mobile nature of the use.  Vehicle access to the extraction and screening sites will be obtained via existing property accesses.

 

(k)   is located and designed in ways that minimize the need for flood, bushfire and landslide mitigation and to protect people and premises from such natural events;

 

The development site is not identified as being susceptible to natural hazards.  Nevertheless the development does not involve the installation of any permanent buildings or structures.  All equipment utilized in the extraction and screening processes is mobile and can be relocated if a hazardous event were to occur.

.

(l)    has water supply, stormwater disposal, sustainable effluent and waste disposal and power to appropriate standards adequate for the use; and

 

The development does not require effluent disposal, water or electricity supply due to the mobile nature of the use.  Stormwater will be managed through the construction of bunds around the stockpiles of dredged materials.  Stockpiles will be located a minimum distance of 50 metres from the main creek channel.

 

(m) does not impact adversely on infrastructure.

 

The development will not impact on water, sewerage or electrical infrastructure networks.  The development will utilise Mt Saltbush Road, and to a lesser extent Blythdale Road, as haulage routes from the site. Conditions will be imposed to take account of the potential impacts on the local road networks

 

The Code’s relevant Performance Criteria are shown below, in order to more easily permit structured and detailed consideration of relevant issues—

 

Rural Zone Code

The Codes’ relevant Performance Criteria are shown below, in order to more easily permit structured and detailed consideration of relevant issues—

 

Relevant performance criteria - 

the Rural Zone Code

Assessment responses

For all of the Rural Area

1. Infrastructure

PC1 Electricity

Premises are provided with a supply of electricity and adequate for the activity.

The proposed development does not require electricity supply.

 

PC2 Water Supply

Premises are provided with an adequate volume and supply of water for the activity.

The proposed development does not require water supply.

PC3 Effluent disposal

To ensure that public health and environmental values are preserved, all premises provide for the treatment and disposal of effluent and other waste water.

Due to the mobile nature of the proposed use, onsite effluent disposal will not be required.

PC4 Stormwater/Inter-allotment Drainage

Stormwater is collected and discharged so as to:

a)   protect the stability of buildings or the use of adjacent land;

b)   prevent the waterlogging of nearby land; and

c)  protect and maintain environmental values.

Stormwater will be managed through the construction of bunds around the stockpiles of dredged materials.  Stockpiles will be located a minimum distance of 50 metres from the main creek channel. 

PC5 Vehicle Access

Vehicle access is provided to a standard appropriate for the use.

The development will utilise the existing vehicle crossovers from Mt Saltbush Road and Blythdale Road to access the site.

PC6 Parking and manoeuvring

Vehicle parking and service vehicle provision is adequate for the use whilst ensuring both safe and functional operation for motorists and pedestrians.

The proposed development will not require designated parking spaces within the site due to the mobile nature of the use.  The large site area will allow sufficient area for vehicles to manoeuvre internally to exit onto the roadway in forward direction.

PC7.1 Roads

All weather road access is provided between the premises and the existing road network.

N/A – The proposed development does not involve the construction of new roads.

 

PC7.2 Location

Development must be located where there is convenient access.

The development site has all-weather vehicle access to the existing road network.

 

PC8.1 Highways

All Highways are maintained and enhanced as a link between major centres.

 

 

 

PC8.2 State Controlled Roads

Development adjacent to State Controlled Roads is located to ensure safe and efficient use of the highway and maintain the integrity of the highway as a commuter link.

 

PC8.3 Noise Sensitive Development

Noise sensitive developments (residential, educational and community) must ensure that road traffic noise levels are appropriately managed to achieve acceptable levels of amenity.

The development site does not have direct access to a State Controlled Road and will not adversely impact on the highways as a link between major centres.

 

 

The development site is not located adjacent to a State Controlled Road.

 

 

 

 

 

N/A – The proposed development is not a noise sensitive use.

PC9 Gas and Oil Pipelines

Buildings are located at an appropriate distance from pipelines to ensure community safety and operation of the use is not compromised.

The proposed use does not involve the establishment of any buildings within proximity to gas and oil pipelines.

 

 

PC10 Refuse Tips and Effluent Treatment Plants

Premises are located at an appropriate distance from refuse tips or effluent treatment plants to ensure community safety and operation of the uses are not compromised.

The development involves the use of mobile equipment and machinery that will be relocated to various working areas within the site as material is sourced from different locations within the creek.  The development will not result in the establishment of any premises in proximity to refuse tips or effluent treatment plants and will not be adversely impacted by such facilities.

 

PC11.1 Rail Corridors

Development is at an appropriate distance from the rail corridor so as not to prejudice safety, speed or intended role of the existing and proposed rail corridors.

 

PC11.2 Noise Attenuation

Development adjoining the rail corridor is protected from the impact of noise. 

The development site is not located in proximity to a rail corridor and does not involve a noise-sensitive use.

 

 

 

 

 

 

 

PC12 Electricity Transmission Line Easement – Vegetation

Transmission lines within an Electricity transmission line easement are protected from vegetation.

The development site is not located in proximity to electricity line easements.

PC13 Electricity Transmission Line Easement – Separation Distance

Habitable buildings and community orientated uses are located a minimum distance from lines to ensure community safety.

The proposed development does not involve habitable buildings or community orientated uses.

2.  Environment

 

PC14 Watercourses

Development ensures the maintenance of riparian areas and water quality including protection from off-site transfer of sediment.

The proposed development involves the extraction and subsequent screening of sand from Blyth Creek.  Dredged materials will be stockpiled within bunded areas located a minimum distance of 50 metres from the main creek channel.  The activity will be undertaken in accordance with a Site Based Management Plan and the DEHP conditions of approval which require the implementation of control measures to prevent the transfer of sediment.

 

PC15 Flooding

Premises are designed and located so as:

a)   not to be adversely impacted upon by flooding;

b)   to protect life and property; and

c)   not to have an undesirable impact of the extent and magnitude of flooding.

The development site is not identified as being susceptible to flooding, however the extraction and screening of materials will occur within close proximity to Blyth Creek.  Nevertheless all machinery and equipment associated with the use is mobile and therefore can be easily relocated in the event of a flood.

 

PC16 Air Emissions

Air emissions from premises do not cause environmental harm or nuisance to adjoining properties or sensitive land uses.

The proposed development will be required to comply with conditions of approval for the operation of ERA 16, which include measures to minimise air emissions from the proposed use in accordance with Environmental Protection (Air) Policy 2008.

 

PC17 Noise Emissions

Noise emissions from premises do not cause environmental harm or nuisance to adjoining properties or sensitive land uses.

The proposed development will be required to comply with conditions of approval for the operation of ERA 16, which include measures to minimise noise emissions from the proposed use in accordance with Environmental Protection (Air) Policy 2008.

 

PC18 Water Quality

The standard effluent and/or storm water runoff from premises ensures the quality of surface water is suitable for:

a)   the biological integrity of aquatic ecosystems;

b)   recreational use;

c)   supply as drinking water after minimal treatment;

d)   agricultural use; or

e)   industrial use.

The proposed development will be required to comply with conditions of approval for the operation of ERA 16, which include measures to ensure the quality of surface water is maintained.



PC19 Excavation and Filling

Excavation and filling of land ensures:

a)   that both the amenity and safety of users of the site and adjacent land holdings;

b)   soil erosion is kept to a minimum with remedial works.

The proposed use will not require any significant earthworks.  Minor earthworks will be undertaken for the construction of banks and/or diversion drains to manage stormwater where materials are stockpiled.  Conditions of approval will require any excavation and filling to be carried out in accordance with Schedule 8 – Standards for Construction Activity.

PC20 Construction Activities

Both erosion control and silt collection measures are undertaken so as to ensure protection of environmental values during construction.

Conditions of approval will require erosion and sediment control measures to be implemented for the protection of environmental values.

PC21 Separation of Incompatible land uses

Separation distances are provided to ensure:

a)   the future viability of surrounding uses;

b)   infrastructure items are protected from incompatible development;

c)   an appropriate standard of amenity and public safety; and

d)   conflict arising from incompatible uses is minimised.

The proposed development is a non-blasting extractive industry.  Operations of the activity will be appropriately separated from existing sensitive land uses.

PC22.1 Development in the Vicinity of airports:

Development in the vicinity of Airports:

a)   does not adversely affect the operation of the airport;

b)   is designed and located to achieve a suitable standard of amenity for the proposed activity; and

c)   does not restrict future operational demands of the airport.

N/A – The site is not located within 100 metres of the boundary of an airport.

PC22.2 Airport Protection

The development of premises does not cause an obstruction or other potential hazard to aircraft movement associated with the airport by way of:

-   the physical intrusion of buildings or other structures into the Obstacle Limitation Surfaces;

-   attracting birds and or bats to the area which could cause or contribute to bird strike hazard;

-   providing very bright lighting or lighting similar to aerodrome lighting, which can distract or confuse aircraft pilots;

-   interfering with navigation or communication facilities;

-   emissions that may affect pilot visibility or aircraft operations; or

-   transient intrusions into the airport’s operational space.

The proposed development is not located in proximity to an airport and will not cause obstruction or other potential hazard to aircraft movements.


PC23 Good Quality Agricultural Land

Good Quality Agricultural Land areas as identified in Map R2 – Good Quality Agricultural Land are conserved and managed for the longer term and protected from development that may lead to its alienation or diminished productivity.

The site is identified as Good Quality Agricultural Land, however the proposed development will provide a necessary resource for the growth of the region.  The development will occupy a minor portion of the total site area and will allow the existing agricultural use to continue as the primary land use.

 

PC24 Vegetation Retention

Development retains vegetation for the:

a)   protection of scenic quality;

b)   protection of general habitat;

c)   protection of soil quality; and

d)   establishment of open space corridors and networks.

The development site does contain significant vegetation, however the DEHP conditions of approval restrict operations of the activity to existing cleared land and roads.  

 

PC25 Protected Areas

Development is undertaken to ensure areas of significant biodiversity and habitat value are protected.

The development site does contain protected areas, however the DEHP conditions of approval restrict the disturbance area of the screening sites and limit operations of the use to existing cleared land and roads in order to protect areas of significant biodiversity and habitat value. 

PC26 Sloping Land

Development is undertaken to ensure:

a)   vulnerability to landslip erosion and land degradation is minimised; and

b)   safety of persons and property is not compromised.

Designated working areas will be located away from the creek banks and are of gentle undulating slope not exceeding 15 percent.

 

PC27 Bushfire Hazard Area

Development maintains the safety of people and property by avoiding areas of High or Medium Bushfire hazard or mitigating the risk through:

a)   the siting of buildings ensuring setbacks from hazardous vegetation are maximized and elements least susceptible to fire are sited closest to the bushfire hazard; and

b)   the provision of firebreaks to ensure adequate setbacks between buildings structure and hazardous vegetation.

The development site does contain areas identified as a bushfire hazard, however proposed use does not involve the establishment of any buildings or structures on the site.  The DEHP conditions of approval restrict operations of the use to existing cleared land and roads.  

 

PC28 Buildings of Significance

The architectural merit and precinct value of cultural heritage items listed in Schedule 10 is maintained.

N/A – The development does not contain and is not located in proximity to buildings identified as being of architectural merit or cultural heritage significance.

 

PC29 Cultural Heritage

The significance of known places of indigenous and/or cultural heritage value is retained.

N/A – The site does not contain nor is it located in close proximity to known places of indigenous and/or cultural heritage value.

PC30 Character Buildings

Development adjacent to buildings identified as heritage or character buildings incorporates design features, materials and details that blend with the existing character.

N/A – The development is not adjacent to buildings identified as heritage or character buildings.

PC31 Residential Outbuildings

Rural amenity is to be maintained.

N/A – The proposed development does not include residential outbuildings.

PC32 Buffers

Adequate buffers are provided to protect rural residential uses from agricultural, transport and industrial activities whilst also ensuring the integrity and viability of such uses.

The proposed development is appropriately separated from residential and sensitive land uses and will not harm the integrity and viability of such uses. 

 

 

 

4.0       Road use

 

The dominant concern for the Council is the impact of heavy vehicles on local roads. Most other impacts are environmental and are addressed by the extractive industry conditions imposed by the Department of Environment and Heritage Protection (DEHP).

 

The main proposed haul route along Mt Saltbush Road does not need a road safety audit as it is already used by heavy vehicles associated with the oil and gas industries and has been upgraded to an appropriate standard for safety and maintenance.

 

The other proposed haul road is along Blythdale Road to the Warrego Highway. This is only for occasional use according to the application. Providing it is not used for road trains, Blythdale Road will not require a safety audit. The maximum sizes of vehicle permitted to use the road without a safety audit are semitrailers and B-Doubles under 19 metres total length.

 

Sections of Blythdale Road will need to be used for access to Mt Saltbush Road. The developer will be required to ensure that the sections of the road used are safe for the types of vehicles using the road.

 

The maximum tonnage hauled on all local government roads is 100,000 tonnes per annum.

 

The use of all local roads requires an initial contribution of 20 cents per tonne to pay for road impacts as these are impacts added to the road on top of existing uses.  This amount will be reviewed annually based on road condition assessment reports to be provided by the developer.

 

The developer will be responsible for the costs of repairing roads damaged by the extractive industry use.

 

5.0      Submissions

 

There were no properly made submissions lodged to Council during the public notification period. 

 


Attachment 2

Plan of Development

 


Attachment 3

DEHP Conditions of Approval